The first Bliss Steering Committee (BSC) meeting was held on the 4 April 2019
|
|
|
|
|
|
Present: JS, JM. MG, LC, AS, AG (chair)
|
|
|
|
|
|
Excused: HR, JB, MK
|
|
|
|
|
|
The following topics were discussed:
|
|
|
|
|
|
1. the Terms of Reference were reviewed and all agreed that visualisation and data format were missing from the ToRs
|
|
|
|
|
|
**TODO**: **AG** to add visualisation and data format to ToR
|
|
|
|
|
|
2. JS proposed the following scientists be part of the BSC - Manfred Burghammer (ID13), Wout de Nolf (ID21) and Veijo Honkimaki (ID31)
|
|
|
|
|
|
**TODO**: **JS+HR** to invite scientists to BSC
|
|
|
|
|
|
3. The BSC meeting will normally be held on the first Thursday of every month.
|
|
|
|
|
|
4. Jordi Bodera will be invited to attend the meetings
|
|
|
|
|
|
5. MG presented the status of the BLISS project (slides). He explained how they have moved from Scrum to Kanban as their development methodology and that this was better adapted to the team.
|
|
|
|
|
|
6. The issue of MCA data not being treated as an image was raised.
|
|
|
|
|
|
7. The implementation of the 4-circle HKL geometry is done and needs to be documented so that it can be included in the master branch. This will serve as basis for other geometries. The first users will be the CRGs.
|
|
|
|
|
|
8. The status of the BLISS documentation was reviewed. It is clear that even if it is improving it needs improving in terms of the structure, the English and drawings.
|
|
|
|
|
|
9. There is a conflict between the ECAPS project requests and conversion of beamlines to BLISS. There is not enough manpower for doing both. Conversion of beamlines to BLISS will have highest priority in 2019.
|
|
|
|
|
|
10. The PCs on the beamlines to be converted have been upgraded to Debian 9 / 10 (?) in preparation of installing BLISS.
|
|
|
|
|
|
11. The list of BLISS controllers to be developed is documented in issue ???
|
|
|
|
|
|
12. There is a need to improve communication between BCU members who are working on converting beamlines to BLISS. Some of the teams are not operational yet. To be followed up outside the BSC and reported back at next BSC.
|
|
|
|
|
|
**TODO**: **JM+LC** to report on BLISS beamline conversion teams at next BSC |