... | ... | @@ -20,8 +20,7 @@ This is the current picture of the items in the sprint: |
|
|
| U 08/04/2018 | #286 flint bug when number of points < 3 | 2 | DONE 10/04/2018 |
|
|
|
| U 05/04/2018 | #281 `move_done` callback called multiple times | 3 | DONE 10/04/2018 |
|
|
|
| U 05/04/2018 | #280 Timeout on channel| 8 | DONE 13/04/2018 |
|
|
|
| | **Total Planned** | **32** | 2 |
|
|
|
| | **Not completed** | | 11 |
|
|
|
| | **Total Planned** | **32** | 13 (11 from non-finished items) |
|
|
|
| | **Total Unplanned** | **15** | 15 |
|
|
|
| | **Grand Total** | **47** | 28 |
|
|
|
|
... | ... | |