... | ... | @@ -7,8 +7,8 @@ Length of the sprint: 2 weeks (28/08 to 08/09) |
|
|
| S. Petitdemange | available during the sprint except 01/09 at 50% | 4.5 days |
|
|
|
| T. coutinho | absent for two weeks | 0 days |
|
|
|
| C. Guilloud | absent 28/09 and 29/09 at 50% | 4days |
|
|
|
| V. Michel | available during the sprint except 01/09, 04/09 and 05/09 at 80% | 5.5 days |
|
|
|
| M. Guijarro | available excep 01/09 at 60% | 5 days |
|
|
|
| V. Michel | available during the sprint except 01/09, 04/09 and 05/09 at 75% | 5.5 days |
|
|
|
| M. Guijarro | available excep 01/09 at 55% | 5 days |
|
|
|
| E. Papillon | absent (off-sick on the day) . Product Owner role | |
|
|
|
| J. Bodera | available (reduced availability Friday 08/09). Scrum Master role | |
|
|
|
|Total | | 19 days |
|
... | ... | |