... | @@ -55,17 +55,12 @@ The priority levels for the listed tasks are: |
... | @@ -55,17 +55,12 @@ The priority levels for the listed tasks are: |
|
* Integration in the scanning framework
|
|
* Integration in the scanning framework
|
|
* Documentation
|
|
* Documentation
|
|
|
|
|
|
* Finalizing the configuration structure and configuration parameter handling : ****High Priority****
|
|
* Finalizing the configuration structure and configuration parameter handling : ****Top Priority (15.3.2019) ****
|
|
|
|
|
|
* Guidlines to the configuration of scans, instruments and experiments
|
|
* Guidlines to the configuration of scans, instruments and experiments
|
|
* Save and load parameter sets
|
|
* Save and load parameter sets
|
|
* Organization for beamline specific code and sequences
|
|
* Organization for beamline specific code and sequences
|
|
|
|
|
|
* Organize a series of training sessions for BCU members : ****High Priority****
|
|
|
|
|
|
|
|
* Short session to treat one topic at a time
|
|
|
|
* Dates to be fixed
|
|
|
|
|
|
|
|
* Finish temperature controller framework : ****Medium Priority****
|
|
* Finish temperature controller framework : ****Medium Priority****
|
|
|
|
|
|
* Finalize concepts and functionality
|
|
* Finalize concepts and functionality
|
... | | ... | |