... | ... | @@ -60,7 +60,7 @@ Harald explained that a Gate A letter for ID17 has been issued and that Council |
|
|
|
|
|
**2. Pending Actions**
|
|
|
|
|
|
.28 Confirm Bliss conversion plan & SPEC support end: Jens shared a slide with the information. **THE LINK WILL BE ADDED AS SOON AS POSSIBLE**
|
|
|
.28 Confirm Bliss conversion plan & SPEC support end: Jens shared a slide with the information: [BCU_Beamline_Conversion_2021.pdf](uploads/33db2706b25f85f6e94c6839a129f7e2/BCU_Beamline_Conversion_2021.pdf)
|
|
|
|
|
|
.33 BLISS Steering Committee future: It was agreed that changing the structure of the BSC is a good idea. The objective of having representatives that are close to the requirements of the software and technical solutions was endorsed. It was decided that by the next Bliss Steering Committee, the new representatives for the meeting would have been selected and the current structure could be formally shut down to let the new structure take its place.
|
|
|
|
... | ... | @@ -70,11 +70,11 @@ Harald explained that a Gate A letter for ID17 has been issued and that Council |
|
|
|
|
|
**3. Status update on Beamline conversion to BLISS from SPEC**
|
|
|
|
|
|
Jens already covered this topic within issue .28
|
|
|
Jens already covered this topic within issue .28 (see [BCU_Beamline_Conversion_2021.pdf](uploads/33db2706b25f85f6e94c6839a129f7e2/BCU_Beamline_Conversion_2021.pdf))
|
|
|
|
|
|
**4. Status update on BLISS Core development and GUI**
|
|
|
|
|
|
Matias presented this slides: **LINK TO PRESENTATION STILL MISSING** and explained that there are 3 categories of issues with the current BLISS version:
|
|
|
Matias presented this slides: [19-bliss-steering-committee-meeting.pdf](uploads/02a4563c013564755bacc8c0e8fbb476/19-bliss-steering-committee-meeting.pdf) and explained that there are 3 categories of issues with the current BLISS version:
|
|
|
1. excessive CPU usage
|
|
|
2. Overhead time
|
|
|
3. Timeouts
|
... | ... | |