Flint: Using normalization counter stuck the GUI
Feedback from ID31.
In FLINT: if the normalization counter is selected, the next scan can freeze the FLINT and we need to restart it. Combination of Pilatus detector LIMA and BLISS caused timing issues when short acquisition was requested. This is now solved by adding an artificial delay in BLISS (3 ms). This is a temporary solution and has to be solved at the LIMA level
This have to be analysed, but i guess the problem is at another place, like a BLISS scan is not terminated.